You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Closing this as not planned. The Sprint 5 framing and the 1.0.0 milestone are stale (the repo is shipping on the 0.3.x line) and the scope here is too broad to be actionable as a single issue. If we want to push on adoption readiness, let's open focused issues for the specific deliverables we actually want next (for example, an integration walkthrough, a contribution guide, or a reference sample) so each one has a clear owner and definition of done.
Activity
[-]Sprint 5 - Factory Enablement & Adoption Readiness[/-][+]Sprint 5 - Adoption Readiness[/+]10 remaining items
placerda commentedon Jun 14, 2026
Closing this as not planned. The Sprint 5 framing and the 1.0.0 milestone are stale (the repo is shipping on the 0.3.x line) and the scope here is too broad to be actionable as a single issue. If we want to push on adoption readiness, let's open focused issues for the specific deliverables we actually want next (for example, an integration walkthrough, a contribution guide, or a reference sample) so each one has a clear owner and definition of done.