Skip to content

Bring the Actions workflows within R-36a's five conditions - #2

Open
matorclawson wants to merge 1 commit into
mainfrom
principal/actions-five-conditions-20260925
Open

matorclawson wants to merge 1 commit into
mainfrom
principal/actions-five-conditions-20260925

Conversation

@matorclawson

Copy link
Copy Markdown
Contributor

What changed

  • verify.yml: added top-level permissions: contents: read (1); pinned all actions (3); timeout-minutes: 20 on verify (recent max 8 min) and added concurrency group ${{ github.workflow }}-${{ github.ref }}, with cancel-in-progress: ${{ github.event_name == 'pull_request' }} so runs on main are never cancelled (4).

SHAs used

  • actions/checkout@11d5960a326750d5838078e36cf38b85af677262 # v4
  • astral-sh/setup-uv@38f3f104447c67c051c4a08e39b64a148898af3a # v4
  • actions/setup-python@a26af69be951a213d495a4c3e4e4022e16d87065 # v5

Conditions 2 and 5 already passed for every file here and still do: no pull_request_target, and no secrets reach a PR-triggered run.

Timeouts are about twice the longest job in the recent runs, rounded up to 5 minutes, minimum 5.

zeo.yml is the org canon and is fixed there (SOW-40), not in this PR.

Opened by ZEO-RT under the interim conditions of SOW-36, per R-36 amendment 3 and the R-36j item 9 finding (ZEO-RT-SOW-40). Merging is the operator's act.

馃 Generated with Claude Code

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant