Repository navigation
fix(auction): classify bid submission outcomes before releasing recovery material - #241
Conversation
|
@Adedoyinjr is attempting to deploy a commit to the truthixify's projects Team on Vercel. A member of the Team first needs to authorize it. |
Format src/lib/stellar/names.ts, src/pages/NamesAuctions.tsx, src/store/nameWatchlistStore.tsx, src/lib/stellar/auctionBidReconciliation.test.ts, and src/lib/stellar/auctionBidSubmission.test.ts per the repository's prettier configuration. No behavioral changes.
truthixify
left a comment
There was a problem hiding this comment.
Changes requested on exact head 3ccee4a. The submission/reconciliation behavior is now correct and the focused suites pass 38/38, but the required build gate is red because format:check fails on auctionBidReconciliation.test.ts, auctionBidSubmission.test.ts, names.ts, NamesAuctions.tsx, and nameWatchlistStore.tsx. Format those files and rerun CI. This head has the same tree as #238, so please coordinate one canonical PR to avoid duplicate merges.
|
Hi, I fixed the Prettier formatting issues for PR #241 in commit 33eaf3a, based on the PR's original head 3ccee4a. The fix is pushed to Adedoyinjr/www:fix/bid-lifecycle-clean, and the formatting, tests, and build pass locally. I don't have write access to Adedoyinjr/demo, so could someone with access sync this commit to fix/bid-lifecycle-clean and let CI rerun? PR #238 and PR #241 also need coordination so only one canonical PR is merged. |
Upgrade toml override from 4.2.0 to 5.0.1 (fixes 3 high-severity CVEs: GHSA-4qx8-w7c3-pj3p, GHSA-9j65-hcg3-gc64, GHSA-9qmh-m7c6-f92p) and add zod override at 4.6.6 (fixes GHSA-mrhx-c7xc-m3w5). Update SECURITY_AUDIT.md: remove braces from accepted findings (no longer vulnerable), update result table (high 1→0), update overrides table, update CI gate description (high ≤ 0). Update scripts/audit-gate.mjs: MAX_HIGH from 1 to 0. Update dependency-compatibility test: toml version expectation 4.x→5.x.
truthixify
left a comment
There was a problem hiding this comment.
Remote malware screening passed again on exact head 5e280c3. Build and repository checks are green. Local verification passed the production build, 60 focused auction/recovery tests, and the production audit gate with 0 critical and 0 high findings. The revised lifecycle preserves recovery material and reconciles ambiguous submissions only from authoritative transaction status.
Summary
Supersedes #238
Closes #238