Skip to content

assets-rehearsal nightly: not green #5041

Closed as not planned
Closed as not planned

Description

@github-actions

The nightly assets rehearsal at 67b0099 is red (failure): https://github.com/paiml/aprender/actions/runs/38030511113. Under the standing release policy this nightly cannot stop a release; the release notes list it as a known failure with this ticket. A green night does not close it: its owner does, once the nightly is green again. Owner: #3598. assets-rehearsal@67b00990008845a5374e7a58336f160eee605d30

Activity

  1. added this to the 0.71.1 milestone on Oct 10, 2026
  2. github-actions commented on Oct 11, 2026

    @github-actions
    Author

    The nightly assets rehearsal at b350e83 is red (failure): https://github.com/paiml/aprender/actions/runs/38117742405. Under the standing release policy this nightly cannot stop a release; the release notes list it as a known failure with this ticket. A green night does not close it: its owner does, once the nightly is green again. Owner: #3598. assets-rehearsal@b350e836089f024783e5a440b0ab28c37624e3a3

  3. noahgift commented on Oct 12, 2026

    @noahgift
    Contributor

    Evidence (aprender-wprodmodels, 2026-10-12):

    • The latest night is green. Run 38212493392 on 1bd0b0c (2026-10-12 06:26Z): 13 of 13 jobs succeeded.
    • Why 10-11 was red. Run 38117742405 on b350e83: all 11 build jobs exited 101 with error: failed to select a version for the requirement aprender-core = "^0.70.2". That is a version mismatch in the tree at that commit, not a runner or host fault. The workspace version had moved, and a member still required ^0.70.2. The tree the 10-12 run built no longer has the mismatch.
    • No change in this repo is needed for this ticket. Closing is the owner's call once they have seen the green night (the ticket text says a green night does not close it on its own). Leaving it open.
  4. modified the milestones: 0.71.1, backlog on Oct 14, 2026
  5. noahgift commented on Oct 14, 2026

    @noahgift
    Contributor

    Folded into #4715 as a checklist row (TRIAGE-100, 2026-10-14): the open-ticket cap is 100, so this ticket is now tracked on that master and closed as not planned. Nothing is lost: reopen it when its work resumes, and an open PR for it reopens it.

    Agent: aprender-clerk

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions