Release CI: one job, one reserved runner — a release PR must not fan out into 20 queued jobs #4433

Closed as not planned
2 of 2 issues completed
Closed as not planned

Description

@noahgift

OPERATOR, verbatim (2026-09-25, cop session): "the release has 11 jobs??? wtf, merge into one"

Measured on 0.69.5 (#4318, run 36148145139): the release PR's CI fanned out into 20 jobs, and at 14:46Z 11 of them were still queued behind other PRs' jobs on the shared clean-room pool. A release waits on the slowest queue position among 20.

Want: when the head is a release/rc car, CI runs as ONE job on a runner reserved for releases (label release, never taken by non-release jobs). That job runs the same checks sequentially, gate + workspace-test included, and reports the required contexts (ci / gate, workspace-test).

done_when:

  • A release-car PR shows 1 job, which starts in ≤60 s while the pool is saturated.
  • The same checks are executed: the release job runs every step the fan-out runs, with Σ steps equal and a case table in the PR.
  • A non-release PR is unchanged.
  • The mutation proof: remove a step from the release job → the parity check goes RED.

kind: code

Folded sub-tickets (TRIAGE-100, 2026-10-14)

These open sub-tickets were folded here as checklist rows and closed as not planned so the open count stays at or under 100. Reopen one when its work resumes; an open PR for it reopens it.

Activity

  1. added this to the 0.70.0 milestone on Sep 25, 2026
  2. noahgift commented on Sep 25, 2026

    @noahgift
    ContributorAuthor

    Re-scope (cop, relaying the operator's ruling of 2026-09-25 16:58 Madrid, verbatim):

    1. CI = 5 fat jobs (x86 main, gx10, yoga, mac-refusal, determinism). Each runs all parts to completion on the biggest runner in its class, nextest full-core, sccache warm. Same test set as today (Σ executed unchanged).
    2. No RC CI run. rc.N = tag on a queue-green main sha, cut within 5 min of green. Hardware jobs + clean-room + accuracy receipts run in parallel on the rc tag and gate PROMOTION, not the rc. Promotion failure → rc.N+1.
    3. Release CI: one job, one reserved runner — a release PR must not fan out into 20 queued jobs #4433 re-scoped to 1+3. Collapse 20 → 5 jobs. The train-active priority hook stays as a floor.

    done_when now covers items 1 and 3: 20 → 5 jobs, with Σ executed equal to today's (case table); the rc tag is cut on a queue-green main sha within 5 min; promotion is gated by receipts on the tag. #4318 finishes as-is.

  3. noahgift commented on Sep 25, 2026

    @noahgift
    ContributorAuthor

    Item 3 of the operator's 'make today's rulings permanent' (done = merged + enforced): the #4433 ci.yml PR must also ship a Σ-executed invariant check. The check fails when the set of tests executed across the 5 jobs differs from today's set (by test id, not by count), and a mutation that drops one test turns it RED. [U] until merged.

  4. added 4 commits that reference this issue on Sep 25, 2026
  5. 60 remaining items

  6. modified the milestones: 0.71.0, 0.72.0 on Oct 14, 2026
  7. modified the milestones: 0.72.0, 0.73.0 on Oct 14, 2026
  8. noahgift commented on Oct 14, 2026

    @noahgift
    ContributorAuthor

    Folded into #5306 as a checklist row (TRIAGE-100, 2026-10-14). Under the cop's ruling, tickets with a P0 label or the operator's own words that are sub-rows of an existing master are folded, with the operator's text quoted on the master exactly as written. Priority and owner carry over on the row.

    Owner aprender-78: if you object, say so here or in the inbox and this ticket is reopened. Work on it continues as before; a PR for it reopens it.

    Agent: aprender-clerk

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata