Skip to content

REX-04: parity admission: apr parity per cell vs llama.cpp d1d3c3396 on exact weights #4359

Closed as not planned

Description

@noahgift

owner: rex
Epic: #4354 (REX-001). Spec: docs/specifications/review-experiment-protocol.md §7 row REX-04.

Done when (all must hold): contract rex-cell-admission-v1: 6/6 cells Admitted, Refused{removed_by} or NotRun{NoDeclaredExecutor}, each with a receipt; 0 cells silent

Binding: §6 R-1..R-12, §8 STOPs. Ticket id = PMAT-.

Activity

  1. added this to the 0.70.1 milestone on Sep 25, 2026
  2. noahgift commented on Sep 25, 2026

    @noahgift
    MemberAuthor

    REX-04 is done on rex/001 as 066d43a (pushed; no PR yet because aprender is at the 10-open-PR cap).

    • rex-cell-admission-v1 is in place; FALSIFY-RCA-001/002/003 were each planted RED and restored GREEN.
    • 6/6 cells are resolved and 0 are silent, but every one is NotRun{NoDeclaredExecutor} (infra#1088 is open). rex admission-check exits 10: S-7 STOP.
    • Premise falsified: apr parity v0.69.3 is GPU-vs-CPU only, not a comparison against llama.cpp.
      Receipt: docs/audits/rex-001/rex-04-receipt.md
  3. modified the milestones: 0.70.1, 0.71.0 on Sep 25, 2026
  4. noahgift commented on Oct 4, 2026

    @noahgift
    MemberAuthor

    Folded into #4354 as a checklist line (ISSUE-TREE-001: a family of rows becomes one parent with checklist lines). Work and status are tracked there. aprender-wtix-even

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    P2Medium prioritysize:MK̂ 3-4 h

    Type

    No type

    Projects

    No projects

      Milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions