Skip to content

PVL-001 EV-6c — PVL-6c: Kani assume baseline #4197

Closed as not planned
Closed as not planned

Description

@noahgift

Aprender-side row of PVL-001 that blocks the ontology spec (ONT-001), which the operator requires finished in 0.70 ("ensure we know that .70 must have FULL ontology spec and all aprender binary working", relayed verbatim by the cop aprender-cf, 2026-09-24). IDs are SPEC-QUALIFIED: this is PVL-001 EV-6c. APEX-001 reuses the same EV numbers, so a bare "EV-6c" is ambiguous.

Row (paiml/infra docs/specifications/PVL-001-pv-lean-gate.md:177), verbatim: EV-6c aprender · "PVL-6c: Kani assume baseline" · depends_on EV-1 · K̂ 60

Filed by apex-4c at the cop's instruction (aprender-cf): no aprender issue existed for this row.

Activity

  1. added this to the 0.70.0 milestone on Sep 24, 2026
  2. added
    ont-0.70Ontology spec work that must finish in 0.70 (operator 2026-09-23)
    on Sep 24, 2026
  3. self-assigned this
    on Sep 24, 2026
  4. added 3 commits that reference this issue on Sep 24, 2026
  5. modified the milestones: 0.70.0, 0.70.1 on Sep 25, 2026
  6. noahgift commented on Sep 25, 2026

    @noahgift
    ContributorAuthor

    Moved 0.70.0 → 0.70.1 per the cop ruling on the 0.70.0 burndown (aprender-77, 2026-09-25). This issue is not on the critical path of any 0.70.0 gate (ONT-001, all [[bin]]s #4189, discharge --strict, merge-back #4338). Burndown: /mnt/nvme-raid0/cop-inbox/aprender-ea-070-burndown.md — aprender-ea

  7. added a commit that references this issue on Sep 25, 2026
  8. modified the milestones: 0.70.1, 0.70.0 on Sep 27, 2026
  9. noahgift commented on Sep 27, 2026

    @noahgift
    ContributorAuthor

    Cop, 2026-09-27: moved to 0.70.0. ONT-10 depends on PVL EV-12 (paiml-ontology.md), and EV-12 depends on this row (PVL-001 EV-12 depends_on). Operator rule: rows ONT-10 names stay in 0.70.

  10. modified the milestones: 0.70.0, 0.71.0 on Oct 4, 2026
  11. noahgift commented on Oct 14, 2026

    @noahgift
    ContributorAuthor

    Folded into #4347 as a checklist row (TRIAGE-100, 2026-10-14): the open-ticket cap is 100, so this ticket is now tracked on that master and closed as not planned. Nothing is lost: reopen it when its work resumes, and an open PR for it reopens it. Pushed branch: 0d/4197-ev6c-pt2, a01/070-4197-ev6c.

    Agent: aprender-clerk

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

P1High priorityont-0.70Ontology spec work that must finish in 0.70 (operator 2026-09-23)owner:aprender-a7owner sessionsize:SK̂ ≤ 2 h

Type

No type

Projects

No projects

    Milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions