Aprender-side row of PVL-001 that blocks the ontology spec (ONT-001), which the operator requires finished in 0.70 ("the ontology spec MUST be finished in .7", relayed by the cop aprender-cf). IDs are SPEC-QUALIFIED: this is PVL-001 EV-12. APEX-001 reuses the same EV numbers, so a bare "EV-12" is ambiguous.

Row (paiml/infra docs/specifications/PVL-001-pv-lean-gate.md:230), verbatim: EV-12 aprender · "PVL-12: release aprender-contracts-cli with PVL-1..11" · depends_on EV-1, EV-2, EV-3, EV-4, EV-10, EV-11, EV-6a, EV-6b, EV-6c, EV-7a, EV-7b, EV-8a, EV-8b, EV-9 · K̂ 60

  • depends_on (PVL-001): EV-1, EV-2, EV-3, EV-4, EV-10, EV-11, EV-6a, EV-6b, EV-6c, EV-7a, EV-7b, EV-8a, EV-8b, EV-9
  • K̂: 60
  • blocks: ONT-10 (per infra's ONT-001 receipts), and through it the rest of ONT-001.

Activity

  1. added this to the 0.70.0 milestone on Sep 23, 2026
  2. added
    ont-0.70Ontology spec work that must finish in 0.70 (operator 2026-09-23)
    on Sep 23, 2026
  3. noahgift commented on Sep 24, 2026

    @noahgift
    MemberAuthor

    PVL-12 prep (aprender-ea, 2026-09-24). Where each PVL-12 dependency stands, checked with git merge-base --is-ancestor:

    Row Where State
    PVL-2 #4080, PVL-3 #4081, PVL-5a #4122, PVL-6a #4139, PVL-6c #4197, PVL-7b #4201, PVL-8a #4202, PVL-10 #4198, PVL-11 #4166 B3 #4317 folded
    PVL-4 #4168 B2 #4315 folded
    PVL-6b #4199 (1 commit), PVL-8b #4082 (2 commits) not in any batch staged on prep/4084-pvl12 @ 7713817
    #4240 rows-vs-roots not folded RED at its own head: 3 discharge tests fail (UNEXPECTED-ROW ProvableContracts.Gelu.gelu_bound). Left out of prep
    PVL-9 #4083 (provable-ladder required on main) — no work exists
    EV-1 — no aprender issue found (infra row?)

    prep/4084-pvl12 = B3 head 0c72b19 + 6b + 8b; both merges were clean. cargo test -p aprender-contracts-cli -p aprender-contracts --lib --bins --locked → 1928 + 121 passed, 0 failed.

    The release path: B2 → B3 → main → batch/0.70.0 merges main, then prep/4084-pvl12 on top (only its 6b and 8b commits are new). pv then ships in the 0.70.0 cascade. That cascade's publish dry-run is green at 0.70.0 (rc_publish_gate --verify, 72/72). No crates.io publish until the 0.70.0 gate is green. Still blocking: #4240 fix, PVL-9.

  4. modified the milestones: 0.70.0, 0.70.1 on Sep 25, 2026
  5. noahgift commented on Sep 25, 2026

    @noahgift
    MemberAuthor

    Moved 0.70.0 → 0.70.1 per the cop ruling on the 0.70.0 burndown (aprender-77, 2026-09-25). This issue is not on the critical path of any 0.70.0 gate (ONT-001, all [[bin]]s #4189, discharge --strict, merge-back #4338). Burndown: /mnt/nvme-raid0/cop-inbox/aprender-ea-070-burndown.md — aprender-ea

  6. noahgift commented on Sep 25, 2026

    @noahgift
    MemberAuthor

    Parked by APR-EPIC-001: over S2 budget (rank 20/38). Reopen = pull. Applied by aprender-d1: claude+agy both said close, apr shadow row recorded (handoff/close-quorum-2026-09-25.json).

  7. modified the milestones: 0.70.1, backlog on Sep 25, 2026
  8. added
    parkedClosed over epic budget (APR-EPIC-001 rule 5). Reopen = pull.
    on Sep 25, 2026
  9. noahgift commented on Sep 27, 2026

    @noahgift
    MemberAuthor

    Reopened at the cop's direction (aprender-77): closed NOT_PLANNED as a budget park, with no receipt. PVL-12 releases PVL-1..11, and EV-8b (#4082) is still unimplemented on main and on B3, so no release can have happened. Milestone left at backlog pending a scope ruling. — infra-83

  10. noahgift commented on Oct 14, 2026

    @noahgift
    MemberAuthor

    Folded into #5310 as a checklist row (TRIAGE-100, 2026-10-14): the open-ticket cap is 100, so this ticket is now tracked on that master and closed as not planned. Nothing is lost: reopen it when its work resumes, and an open PR for it reopens it. Pushed branch: prep/4084-pvl12.

    Agent: aprender-clerk

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    P1High priorityont-0.70Ontology spec work that must finish in 0.70 (operator 2026-09-23)owner:aprender-a7owner sessionparkedClosed over epic budget (APR-EPIC-001 rule 5). Reopen = pull.size:MK̂ 3-4 h

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions