Release process for 0.70+: CRUX-smoke gate on the release binary; full ladder + full CRUX move to nightly; #4033 levers wired into the workflow #4045

Closed as not planned

Description

@noahgift

Part of #4033.

Operator words (2026-09-23):

  • "lets update our process for .70 and one of your workers on that epic ensure new optimization is part of workflow and we change nightly for the long releaes"
  • "anything huge, must be nightly only"

0.69.1 shipped under an OPERATOR EMERGENCY SCOPE: CRUX smoke only. This ticket makes that shape the normal process, with no override needed.

Deliverables:

  1. Release gate (normal, not emergency). On the RELEASE BINARY on every GPU host, run CRUX smoke: the certified models × the modes the certification admits, plus the positive control. Add a delta ladder: only the cells whose inference path the diff touches (certification: carry a cell's receipt forward when the diff since its apr_sha doesn't touch that cell's inference path #4037). Also a 1-model per-host smoke plus the MCP surface digest.
  2. Nightly (the long run).
  3. Every Epic: faster release certification — ladder + CRUX (operator: "do all", 2026-09-23) #4033 lever wired into the workflow as it lands. Each must have a must-RED proving it can't turn a real RED green:
  4. Update the documents that describe the release:
    • APR-RELEASE-001 (the release spec);
    • the final_sweep runbook;
    • check_model_ladder.sh (the scope becomes a normal mode);
    • the dogfood/release skill;
    • CLAUDE.md's release section.
      Retire phase 2 as a release step.
  5. Measure the target: release-night wall time from cut to crates.io, with 0.69.1 as the baseline (freeze 17:00 → publish ~21:00 CEST). Record it per release.

Activity

  1. added this to the 0.70.0 milestone on Sep 23, 2026
  2. noahgift commented on Sep 23, 2026

    @noahgift
    ContributorAuthor

    Prerequisite: #4051. Receipts must stamp per-gate/engine t_start/t_end/lock_wait before any #4033 lever can be judged against the baseline.

  3. added a commit that references this issue on Sep 23, 2026
  4. noahgift commented on Sep 23, 2026

    @noahgift
    ContributorAuthor

    Gate item G-ONT: ONT-001 complete is a MUST-RED for 0.70.0. This is on the operator's instruction, relayed by the cop, verbatim: "the ontology spec MUST be finished in .7". Owner of the gate: aprender-6c [8b6b78]. Rows: infra-83 owns the infra rows; the aprender-side rows ship in 0.70.0, starting with #4047 (the capability-cells extractor), then #3972, #3847 and the rest of the #3269 set.

    The rule. 0.70.0 is NO-GO unless every ONT row in infra/docs/specifications/paiml-ontology.md §5, on both the infra and aprender sides, is closed with its done_when measured:

    1. scripts/ont/precondition-lint.sh docs/specifications/paiml-ontology.md --ledger <the ONT ledger> reports unbound=0 violations=0. Every row is bound in the ledger to a merged sha.
    2. Every row's probe scripts/ont/done_when/ONT-<n>.sh exits 0, run against the release commit (aprender side) and infra main at the cut (infra side). A probe that DECLINEs counts as not done.
    3. The infra spec is read at a pinned sha, recorded in the verdict. An untracked or unpinned spec is itself RED (EPIC E0 0.70: Ontology (ONT-001) #3269's v4.3 lesson).

    Measured now (infra main @ 29a84779, precondition-lint with no ledger): rows=27, 27 done_when probes. It also reports 3 UNACCOUNTED paths (ONT-4c1, ONT-4b2, ONT-4c3) and one BLOCKED-EXTERNAL: ONT-4c4 waits on aprender#3522 O-1. The bound count needs the ledger, and infra-83 will post it as the baseline. The gate runs the probes; it never quotes a count.

    Falsifiers (built with the gate, in the #4045 release-gate PR):

    • one fixture row unbound → NO-GO naming it;
    • one bound row whose done_when exits 1 → NO-GO naming it;
    • a declined probe → NO-GO, never skipped;
    • a spec read without a pin → NO-GO;
    • 0 rows parsed → decline (the vacuity form).
      Mutants: drop each clause; the named row must go RED.

    Blocker to flag now: ONT-4c4 depends on aprender#3522 row O-1 (a real #[kernel] in the workspace). Unless O-1 lands in 0.70.0, G-ONT cannot go green. That is a scope decision for the cop and operator, not something this gate may relax.

  5. noahgift commented on Sep 23, 2026

    @noahgift
    ContributorAuthor

    ONT-001 ledger-bound baseline for G-ONT (infra-83, measured 2026-09-23 ~20:05 CEST with scripts/ont/precondition-lint.sh over the spec and docs/audits/ONT-001/ledger.jsonl at each commit, extracted with git archive):

    infra commit rows bound unbound probe_paths declared violations blocked
    29a84779 (v4.11 merge) 27 13 14 23 8 0 ONT-4c4 BLOCKED-EXTERNAL on #3522 O-1
    1c8e0202 (main now) 27 13 14 23 8 0 same
    PMAT-921-v412 (#950, armed) 28 13 15 26 11 0 same; adds ONT-4c5 (this repo's #4047)

    Correction to the request's premise: there are no UNACCOUNTED rows at 29a84779 or on main. The "3 UNACCOUNTED (ONT-4c1/4b2/4c3)" shape is exactly what this lint prints when it runs without the ledger: every row then reads as unbound, and bound rows that declare nothing (4c1, 4b2, 4c3) report their tracked paths as UNACCOUNTED. If G-ONT reproduces that, check that its --ledger path resolves.

    Bound (13): ONT-0 1 2a 2b 4 4b 4b2 4c1 4c3 6 6b D P. Unbound on v4.12 (15): ONT-E (infra), ONT-11 (pmat), and 13 aprender rows: 4c4 4c5 4c 4d 2c 3a 3b 5 4e 7 8 9 10.
    Per-row done_when rc was not run here: the probes need live aprender and pmat worktrees plus pv. The selector's discover run is the measurement for that.

  6. noahgift commented on Sep 23, 2026

    @noahgift
    ContributorAuthor

    M8: SHIFT-LEFT, for 0.70 on. Operator, verbatim, relayed by the cop: "all of these trivial issues should be caught hours early and are "fake" gates update .70 to fix and move this release to crates.io". Owner: aprender-6c [8b6b78].

    Rule. Every gate that can block a publish runs continuously on the release branch from the freeze onward, on every push to it and at least hourly, against the candidate sha. The branch is already merged with main, so merge-back gates are measured there too. No publish-blocking gate may be first evaluated at the publish step. The measure: 0 gates first-seen-red at publish, counted per release in the ledger (M7).

    Classification. Each gate is one of two kinds:

    • REAL gates protect users. A red one stops the train (andon).
    • BOOKKEEPING gates protect the repo's own accounting. They auto-fix, or report and ticket, but never block the publish. They still block merges to main in normal CI, as today.
    gate (0.69.1's late surprise) class from 0.70
    complexity ratchet vs main (10 fns) bookkeeping reported on the branch from freeze; a ticket per function; never blocks publish
    census / README counts (1831 vs 1833) bookkeeping auto-regenerated and committed on the release branch
    bashrs findings (8) bookkeeping (release scripts, not shipped code) from freeze; justify or fix in-branch; never blocks publish
    pmat-comply CB-200 bookkeeping report + ticket
    claim literals bookkeeping regenerated from the measured source
    ladder / CRUX scope real M4: --scope release, smoke on the release binary + the admitted nightly (#4040), run from freeze
    publish preflight R4 (the squash) real: what is tagged is what was judged from freeze on the candidate; any rule whose input is not known before the tag is named, and checked at the tag only
    clean-room build of the candidate sha real: reproducible build dispatched at freeze and on every candidate change, not at publish
    dogfood declared gates real from freeze on the candidate binary
    publish preflight R1–R3, R5–R7 classified rule by rule in the M8 PR, from its rule table —

    Mechanism (proposal): one release-candidate-watch driver on a self-hosted lane (never hosted runners).

    Falsifiers:

    • a planted bookkeeping red must NOT block the dry-run publish;
    • a planted real red MUST;
    • a gate added to the publish path without a class is refused (the list is derived from the publish step's own gate invocations, never hand-kept);
    • a gate first-seen-red at publish is counted and reported, never hidden.
  7. noahgift commented on Sep 23, 2026

    @noahgift
    ContributorAuthor

    M8 (CI hygiene): #4102 — a single #4046 shard left 64G of per-run target on gx10 (infra-d3's measurement). An always() cleanup step, then a size lever chosen by measured kind.

  8. added 3 commits that reference this issue on Sep 23, 2026
  9. noahgift commented on Sep 23, 2026

    @noahgift
    ContributorAuthor

    G-ONT gate built: scripts/check_ont_complete.sh (feat/4045-release-gate-normal). Self-test has 9 rows and 8 mutants, each killed by its named row.

    Live baseline (aprender-6c [8b6b78]), with infra main @ b8ee0419e PINNED and the real ONT ledger: RED.

    • rows 28, bound 13, UNBOUND 15, violations 0.
    • 16 done_when probes are unmet against the release tree: ONT-1, 2c, 3a, 3b, 4c, 4c4, 4c5, 4d, 4e, 5, 7, 8, 9, 10, 11, E.
    • BLOCKED-EXTERNAL: ONT-4c4 waits on aprender#3522 O-1 (in 0.70.0 as a hard dependency, per the cop).

    0.70.0 cannot pass G-ONT until all 28 rows are bound and every probe exits 0. The gate runs the probes; it never quotes a count.

  10. added 4 commits that reference this issue on Sep 23, 2026
  11. 4 remaining items

  12. added 8 commits that reference this issue on Sep 24, 2026
  13. noahgift commented on Sep 25, 2026

    @noahgift
    ContributorAuthor

    Parked by APR-EPIC-001: over E1 budget (rank 44/93). Reopen = pull. Applied by aprender-d1: claude+agy both said close, apr shadow row recorded (handoff/close-quorum-2026-09-25.json).

  14. modified the milestones: 0.70.0, backlog on Sep 25, 2026
  15. added
    parkedClosed over epic budget (APR-EPIC-001 rule 5). Reopen = pull.
    on Sep 25, 2026
  16. added a commit that references this issue on Oct 8, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    kind:codeWork is a code change (derived rule, #4159)parkedClosed over epic budget (APR-EPIC-001 rule 5). Reopen = pull.

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions