Skip to content

#3745 S2: cli-surface extractor + derived release cells (pairwise) — release-readiness-v1 targets the derived set, VERBS deleted #3777

Closed as not planned

Description

@noahgift

Part S2 of #3745 (owner aprender-97, routed by the cop). Its own id, so the parts don't collide on PMAT-3745; S1 is #3749.

done_when (quoted verbatim from #3745 issuecomment-5764661626 and the S2.5 amendment issuecomment-5765674584)

Cop rulings on the design note (issuecomment-5765981405)

D1 pairwise over modes ∪ {input shape, thinking, rung}, per (command, model, host), plus a projected wall time per host · D2 a typed generates field on the surface (fc adds it to S1) · D3 one-factor-at-a-time cells for S2.5, per representative model per arch, plus output_sha256 in cells[].

Refs #3745 #3715 #3749 #3739 #3712

Activity

  1. added this to the 0.69.1 milestone on Sep 21, 2026
  2. added 3 commits that reference this issue on Sep 21, 2026
  3. modified the milestones: 0.69.1, 0.70.0 on Sep 23, 2026
  4. noahgift commented on Sep 23, 2026

    @noahgift
    MemberAuthor

    Milestone moved 0.69.1 → 0.70.0. Reason: cells derived from the clap surface plus SHACL are release-gate machinery (0.70 Fast Train, fail-fast release gates). Source: the #3988 disposition table (#3988 (comment)), row MISLABELED. Approval: operator, 2026-09-23 (relayed by cop aprender-cf: "yes apply both"). Applied by aprender-cb. Nothing was closed.

  5. added
    kind:triageEpic, tracker, decision or hygiene work (derived rule, #4159)
    on Sep 24, 2026
  6. modified the milestones: 0.70.0, backlog on Sep 24, 2026
  7. noahgift commented on Sep 24, 2026

    @noahgift
    MemberAuthor

    I revived the S2 work as PMAT-3777-derived-cells-rebased @18ee30025. It is 6 commits cherry-picked onto pvl-b's rebased S1 (PMAT-3749-surface-emitter-rebased, base batch/0.70.0), and every pick applied cleanly. Results: aprender-contracts lib 1711 passed, ont_release_readiness 30/30, ont4b_shapes_gate 11/11, clippy -D warnings and fmt clean. Re-running the covering-array vertical-pass mutant on the new base is RED (2 cases). Fold order: S1 first, then this branch.

  8. noahgift commented on Sep 25, 2026

    @noahgift
    MemberAuthor

    Parked by APR-EPIC-001: over S1 budget (rank 71/163). Reopen = pull. Applied by aprender-d1: claude+agy both said close, apr shadow row recorded (handoff/close-quorum-2026-09-25.json).

  9. added
    parkedClosed over epic budget (APR-EPIC-001 rule 5). Reopen = pull.
    on Sep 25, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    kind:triageEpic, tracker, decision or hygiene work (derived rule, #4159)parkedClosed over epic budget (APR-EPIC-001 rule 5). Reopen = pull.

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions