Six concurrent full-tier workspace-test jobs starve every short job for 74 minutes — the merge queue head cannot advance #3258

Closed as not planned

Description

@noahgift

Six concurrent full-tier workspace-test jobs starve every short job for over an hour

Measured 2026-09-14T09:38Z, aprender only, across all non-completed CI runs:

QUEUED 68–74 min   ci / coverage, ci / provenance, ci / security, ci / test, ci / lint   (20+ jobs)
RUNNING (10)       workspace-test ×6   guard-cargo ×2   guard-tree ×1   ci / lint ×1
                   gx10-build, gx10-pool1, yoga-build,
                   intel-clean-room, -2, -5, -9, -11, -12, -13

The oldest queued job was created at 08:23:48Z and had still not been assigned a runner at
09:38Z. In the same runs, workspace-test is executing — so this is not a dependency wait. The
short jobs are queued behind long ones.

Mechanism

workspace-test is the full tier: 82,217 tests across 73 binaries, ~37 min on a clean-room
runner (measured, job 103868350604). There are six running at once because the merge queue
builds max_entries_to_build: 3 groups in parallel and open PRs run their own.

This is the recorded "two concurrent workspace-tests starve the box" failure at scale — per-run
target dirs mean N concurrent runs are N full workspace builds, and 23 clean-room runners cannot
absorb six of them plus everything else.

The cost is not the tests. It is that a 2-minute ci / lint waits 74 minutes behind them, and
gate cannot conclude until every one of those reports — so the merge queue's head cannot
advance
. main merged nothing between 08:2xZ and 09:4xZ.

The lever is the reuse path, not more runners

scripts/ci_test_tier.sh already has the right idea:

reuse  merge_group only: HEAD^{tree} equals the PR head's tree AND that head's
       workspace-test check-run concluded success — the same tree measured twice
       is the definition of waste. Any doubt -> full.

It almost never fires. Every merge rebases the groups behind it, so the queue tree differs from
the PR-head tree and the tier falls to full. With a 10-deep queue that is close to never.

So the merge queue re-runs 82,217 tests that the PR head already passed, once per entry, three at a
time. That is the six.

Worth investigating, in rough order of value:

  1. Make reuse reachable. The current predicate is exact tree equality. A merge group whose
    only difference from the tested PR head is other people's merged commits is not obviously
    owed a full re-test — but "obviously" is doing a lot of work there and this needs a real
    argument, not a loosened comparison. This is the big one.
  2. max_entries_to_build: 3 → 2. Fewer concurrent full tiers, less starvation, at the cost of
    parallel merge capacity. Cheap to try, easy to revert, and measurable within an hour.
  3. Do not shorten workspace-test by cutting tests. The dark-surface work (1,424 of 1,469 integration targets run only when a PR touches their own crate — four of tonight's defects trace to this #3239, docs(spec): APR-DARK-TARGETS-001 — what the unrun test surface costs, holds, and when it should run #3249) is
    pushing the other way for good reasons.

What this is NOT

Not a runner shortage in the sense of "buy more". At the same instant, 12 of 23 clean-room runners
were busy org-wide (aprender 8, rmedia 3, infra 1) — the fleet had headroom and the jobs still
waited, because the runners that were free could not shorten a 37-minute job already in flight.

And not a dispatch defect: jobs in the same run were executing. GitHub's scheduler is
work-conserving; the work is simply large.

Related: #3251 (fleet throughput), #3239 (the dark surface this must not be "fixed" by shrinking).

Activity

  1. added this to the 0.68.0 milestone on Sep 14, 2026
  2. noahgift commented on Sep 14, 2026

    @noahgift
    MemberAuthor

    Correction: "six concurrent full tiers" is wrong, and so was my top recommendation

    Two errors in the original report. Both mine, both from inferring rather than reading.

    1. It is not six full tiers

    I derived the tier from step states — "did Workspace lib tests run?" — and read six. The
    authoritative source is the Decide the test tier step, which prints tier=. Reading that
    instead, for the same live runs:

    PMAT-246-roadmap-repair               tier=quick
    agent/T-2                             tier=quick
    PMAT-1098-append-only-ledger-union    tier=quick
    PMAT-1099-pvl-1-zero-contracts        tier=quick
    

    Every readable pull_request run is quick. Only the two merge_group runs were full tier.
    Historical check agrees: over the last completed PR runs I could read, 0 of 7 paid the full
    tier.

    So the load is 2 full tiers plus several quick ones (~18 min each: 39,615 tests + 10,333
    tree-reader), not six 37-minute jobs. The aggregate still exceeds what the fleet drains quickly,
    but the shape is different and the headline number was wrong.

    2. "Make reuse reachable" was the wrong thing to rank first

    I listed it as the big lever because it fires 0 of 7 times. Having thought about what it actually
    certifies: 0 of 7 is correct behaviour, not a defect.

    A merge queue exists to test main + this PR, in this order. reuse fires only when the queue
    tree is byte-identical to the tested PR-head tree — i.e. when main did not move. When main did
    move, the merged tree is genuinely different and re-testing it is the entire point of having a
    queue. Loosening that predicate would not be an optimisation; it would be turning off the thing
    the queue is for, and semantic conflicts are exactly what it catches.

    I withdraw that item. It should not be attempted.

    What still stands, measured

    oldest queued job   created 08:23:48Z, still unassigned at 09:38Z   (74 min)
    queued              ci / coverage · provenance · security · test · lint, 20+ jobs
    running             10 jobs across gx10-build, gx10-pool1, yoga-build,
                        intel-clean-room, -2, -5, -9, -11, -12, -13
    main                merged nothing between 08:2xZ and 09:4xZ
    

    Short jobs starve behind long ones, the queue head cannot advance, and that is real.

    The lever list, revised

    1. max_entries_to_build: 3 → 2. Cheap, reversible, measurable within an hour. Fewer
      concurrent full tiers at the cost of parallel merge capacity — and unlike the reuse idea it
      does not weaken what the queue certifies. Note this was deliberately raised 1→3 on 2026-09-10,
      so it is a revisit of a decision, not an oversight.
    2. Scope the merge-group tier to the delta. The queue tree differs from the tested PR head by
      exactly the commits main gained. Testing PR's crates ∪ crates touched by those commits is
      proportional and preserves what the queue certifies, unlike reuse. This is BSE-17 extended to
      merge groups, and it is real work, not a flag.
    3. Not shrinking workspace-test. 1,424 of 1,469 integration targets run only when a PR touches their own crate — four of tonight's defects trace to this #3239/docs(spec): APR-DARK-TARGETS-001 — what the unrun test surface costs, holds, and when it should run #3249 push the other way for good reasons.

    The method note, because it is the second time tonight

    Both errors came from reading an adjacent signal instead of the authoritative one — step states for
    the tier here, and --status queued counting runs rather than jobs in the packer an hour ago,
    which sent me through three false hypotheses. When a number drives a decision, read the field that
    states it.

  3. modified the milestones: 0.68.0, 0.69.0, 0.70.0 on Sep 16, 2026
  4. modified the milestones: 0.70.0, 0.70.1 on Sep 24, 2026
  5. noahgift commented on Sep 24, 2026

    @noahgift
    MemberAuthor

    Milestone 0.70.0 → 0.70.1 (gate triage). 0.70.0 now holds only the operator's release gate: "FULL ontology spec and all aprender binary working" + "0.70 to crates.io" (ONT-001, every [[bin]] build+smoke, the publish cascade), plus P0s and operator-ruled rows. This issue isn't needed for any of those. Evidence: evidence/m070-gate-triage-1835.md. If that's wrong, move it back to 0.70.0 and say which gate it serves.

  6. noahgift commented on Sep 24, 2026

    @noahgift
    MemberAuthor

    Re-measured 2026-09-24 21:15Z: the mechanism this issue names no longer exists

    Scope: every CI run created since 09:00Z today (33 runs, 644 started jobs), queue wait = started_at − created_at.

    2026-09-14 (this issue) 2026-09-24
    merge-group CI runs 10-deep queue, 3 building 3 in 24 h (05:36Z, 11:20Z, 14:37Z)
    workspace-test one ~37 min job 3 shards (#3138)
    job queue wait 74 min oldest p50 1.4 min · p90 12.3 · max 45.3
    • max_entries_to_build: 3 (ruleset "Merge Queue (main)") is still configured, but the batch-PR regime (≤10 open PRs, one PR per epic) means the queue almost never holds more than one entry. Changing 3→2 would have changed nothing today.
    • The 23 jobs that waited over 20 min all fall between 18:xx and 19:xx Z. At 19:45Z, in the middle of that window, only 3 long aprender jobs were running (gpu-touched, determinism, one workspace-test-shard). The wait was not caused by concurrent full tiers.
    • The clean-room pool is 16 runners, all online, all busy. It was 23 on 09-14. The pool is org-level and shared with other repos. Today's waits are a pool-capacity/cross-repo question (fleet/arbiter), not an aprender ci.yml concurrency question.

    No ci.yml or ruleset change is proposed: neither lever acts on the load that exists now. Recommend closing this issue as superseded (batch-PR regime + #3138 sharding). If the starvation needs chasing, open it as a runner-pool ticket against the arbiter, with the per-repo share of the 16 runners during 18–20Z as its first measurement.

  7. noahgift commented on Sep 24, 2026

    @noahgift
    MemberAuthor

    Closing as superseded per the 21:15Z re-measurement above (batch-PR regime + #3138 sharding removed the mechanism). Runner-pool capacity, if it still bites, belongs to the arbiter.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    P0Critical priorityperformancePerformance optimization

    Type

    No type

    Projects

    No projects

      Milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions