Skip to content

P-0.5: freeze the archived upstream: port the two stranded commits + the dirty manzana binding; remove the ../provable-contracts/lean fallback; ARCHIVED-UPSTREAM.md; untrack the 10 .pv/ c #2915

Closed as not planned

Description

@noahgift

DAG row P-0.5 — docs/specifications/pp-066-dag.yaml (epic #2873; spec: #2870 phase 0/1 text (improve-provable-contracts.md not in tree); PP-066 §5 Track P).

Track: P · lane: 0.66 · host: intel (CI runner) for P-0.6, else any · owner: spec-owner · expiry: 2026-09-26 · quorum: review-only

Blockers (rows): DEC-D-11
Linked issues: —

A — acceptance (exit 0 = done):

  • git ls-files | grep -c "\.pv/" prints 0
  • grep -rn "../provable-contracts" crates/aprender-contracts/src prints nothing
  • ARCHIVED-UPSTREAM.md exists

Contract: contracts/pv-p-0-5-v1.yaml
Mutation → RED: re-add the fallback path -> the no-fallback test RED

Filed by the PP-066 driver STEP 5; status tracked in the DAG (status: complete after the receipt docs/audits/impl-<ticket>-receipt.md).

Activity

  1. modified the milestones: 0.68.0, 0.70.0, 0.73.0 on Sep 10, 2026
  2. noahgift commented on Sep 23, 2026

    @noahgift
    MemberAuthor

    triage 2026-09-23 (aprender-dd, standing triage owner): milestoned to 0.70.0, theme Fast Train (CI, gates, pv, release tooling, hygiene); it moved out of backlog (the 2026-09-17 overflow bucket, not a release).

  3. modified the milestones: 0.70.0, 0.72.0 on Sep 24, 2026
  4. noahgift commented on Sep 25, 2026

    @noahgift
    MemberAuthor

    Parked by APR-EPIC-001: over S2 budget (rank 32/38). Reopen = pull. Applied by aprender-d1 under a 3-lane quorum receipt (handoff/balance-quorum-rev4.json).

  5. modified the milestones: 0.72.0, backlog on Sep 25, 2026
  6. added
    parkedClosed over epic budget (APR-EPIC-001 rule 5). Reopen = pull.
    on Sep 25, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    parkedClosed over epic budget (APR-EPIC-001 rule 5). Reopen = pull.pp-066PP-066 (0.66) DAG row

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions