You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
DAG row P-0.3 — docs/specifications/pp-066-dag.yaml (epic #2873; spec: #2870 phase 0/1 text (improve-provable-contracts.md not in tree); PP-066 §5 Track P).
Track: P · lane: 0.66 · host: intel (CI runner) for P-0.6, else any · owner: spec-owner · expiry: 2026-09-19 · quorum: review-only
cargo test -p aprender-contracts --lib proof_credit (a contract with hand-typed l4_lean_proved: 7 and no resolving theorem scores 0)
Contract:contracts/pv-p-0-3-v1.yaml Mutation → RED: re-trust the verification_summary integer in gates_extended.rs:401 / explain_render.rs:133 -> fixture RED
Filed by the PP-066 driver STEP 5; status tracked in the DAG (status: complete after the receipt docs/audits/impl-<ticket>-receipt.md).
triage 2026-09-23 (aprender-dd, standing triage owner): milestoned to 0.70.0, theme Fast Train (CI, gates, pv, release tooling, hygiene); it moved out of backlog (the 2026-09-17 overflow bucket, not a release).
Activity
noahgift commentedon Sep 23, 2026
triage 2026-09-23 (aprender-dd, standing triage owner): milestoned to 0.70.0, theme Fast Train (CI, gates, pv, release tooling, hygiene); it moved out of
backlog(the 2026-09-17 overflow bucket, not a release).noahgift commentedon Sep 24, 2026
PP-066 triage (0.70, cop ruling): closing as duplicate of #2870, which stays open and carries this work.