Repository navigation
fix(cli): restore the 2026-03 draft in the CLI and on calm.finos.org - #3534
Merged
rocketstack-matt merged 3 commits intoOct 27, 2026
Merged
rocketstack-matt merged 3 commits into
rocketstack-matt merged 3 commits into
Conversation
rocketstack-matt
requested review from
a team,
LeighFinegold,
Thels,
aidanm3341,
grahampacker-ms,
jpgough-ms,
lbulanti-ms,
markscott-ms and
willosborne
as code owners
October 27, 2026 11:13
jpgough-ms
approved these changes
Oct 27, 2026
markscott-ms
approved these changes
Oct 27, 2026
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Description
Closes #3532.
Brings back the 2026-03 draft in the CLI bundle and on calm.finos.org until early adopters finish their migration. #3533 tracks its removal.
Decisions and gotchas:
calm/draft/2026-03/is back as it was before feat: remove the 2026-03 draft #3496. Its files are the same, byte for byte, as the files that ci: delete the 2026-03 draft from calm.finos.org #3511 deleted from calm.finos.org.calm/draft/**/meta/*intodist/calmagain. CLI 1.66.0 is the last release that has the draft, andfix(cli)releases a CLI that has it again. The new e2e test blocks calm.finos.org, so it fails if the bundle loses the draft.s3-draft-sync.ymlpublishescalm/draft/to calm.finos.org when this PR merges. It has no--delete, becausedraft/2025-03/is on calm.finos.org but not incalm/draft/(Remove draft/2025-03 from calm.finos.org after OpenRewrite declares a CALM release #3507).s3-docs-sync.ymlexcludesdraft/*again.Type of Change
Affected Components
cli/)calm/)calm-ai/)calm-hub/)calm-hub-ui/)calm-lab/)calm-models/)calm-server/)calm-studio/)calm-widgets/)calm-guard/)docs/)shared/)calm-plugins/vscode/)Commit Message Format ✅
fix(cli)releases the CLI. The twoci:commits do not release anything.Testing
The new e2e test fails when
dist/calm/draft/is removed, and passes with it.npm test --workspace cli(1040 tests), lint andactionlintpass. After the merge I will check that the 21draft/2026-03/URLs give 200 with the same SHA-256 as before #3511, and thatdraft/2025-03/does not change.Checklist