Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
27 changes: 17 additions & 10 deletions docs/CODEX_HANDOFF.md
Original file line number Diff line number Diff line change
Expand Up @@ -2,8 +2,9 @@

## Current checkpoint

T0-3 Documentation, Wiki & Roadmap consolidation is complete through D7. The next checkpoint is
the separately authorized Baseline T0 final acceptance and closure. Baseline T0 is not yet complete.
**Baseline T0 is complete.** T0-1, T0-2, T0-3.0, and T0-3 have passed their accepted closure
criteria. Resume evidence-driven Mosaic product development from the canonical roadmap; do not
reopen completed infrastructure programs without new concrete evidence.

Current repository identity is exactly `constbogdan/Mosaic`; upstream remains
`damontecres/Wholphin`. Work begins from current protected `origin/main` on a purpose-specific
Expand All @@ -30,10 +31,10 @@ not current instruction.

## Immediate continuity

- Do not declare Baseline T0 complete until its independent final acceptance is explicitly
performed and authorized.
- Public guidance is versioned in the repository. Optional Wiki publication remains a separate
operator action and cannot replace engineering authority.
- Existing upstream Draft PR #58 is an expected authenticated human-review waiting state. Do not
close, merge, rewrite, or classify it as a platform failure merely to make the queue empty.

## Non-obvious invariants and negative knowledge

Expand Down Expand Up @@ -78,12 +79,18 @@ rather than silently publishing a rewritten snapshot.

## Open risks and questions

- Baseline T0 still requires its independent final acceptance and closure decision.
- External GitHub settings remain manually administered; documentation may describe them, but no
configuration doctor or scheduled drift monitor is justified without repeated evidence.
- Android TV visual/focus/device behavior is not fully proven by hosted compilation and JVM tests.
- Cross-repository tooling standardization remains evidence-driven; do not copy Mosaic-specific
Gradle, PowerShell, branch, artifact, or release assumptions into another repository.
- **External/manual responsibility:** GitHub settings remain manually administered. Baseline
closure reverified the current ruleset, merge settings, Environments, Actions defaults, Sync Bot
credential names, and repository identity; no configuration doctor or scheduled monitor is
justified without repeated drift evidence.
- **Known non-blocking limitation:** Android TV visual/focus/device behavior is not fully proven by
hosted compilation and JVM tests; future UI changes still require proportionate device checks.
- **Future work:** Cross-repository tooling standardization remains evidence-driven. Do not copy
Mosaic-specific Gradle, PowerShell, branch, artifact, or release assumptions into another
repository.
- **Future product work:** Watchlist, collections/franchises, Discover, suggestions, next-season
automation, quality upgrades, playback improvements, and optional integrations remain roadmap
work rather than baseline infrastructure debt.

## Handoff maintenance

Expand Down
25 changes: 21 additions & 4 deletions docs/MOSAIC_ROADMAP.md
Original file line number Diff line number Diff line change
Expand Up @@ -10,14 +10,31 @@ the [documentation index](README.md).
- T0-2 bounded authority/bootstrap/diagnostic corrections — complete.
- T0-3.0 Mosaic identity establishment — complete.
- T0-3 Documentation, Wiki & Roadmap consolidation — complete through D7.
- **Baseline T0 — complete.** The final acceptance found no unresolved baseline blocker.

Baseline T0 remains open until its independent final acceptance is performed and authorized.
Completing T0-3 does not itself declare Baseline T0 complete.
Baseline closure confirms the current engineering foundation; it does not imply that Mosaic's
product feature roadmap is complete.

## Current priorities

1. Perform the separately authorized Baseline T0 final acceptance and closure.
2. Resume evidence-driven product work from the feature roadmap below after that decision.
1. Resume evidence-driven Mosaic product development from the feature roadmap below.
2. Keep infrastructure and cross-repository work demand-driven rather than reopening completed T0
programs without new evidence.

## Baseline T0 closure

The final acceptance confirmed T0-1, T0-2, T0-3.0, and T0-3 remain complete and coherent. Current
operation retains PR-only integration, authoritative hosted validation, exact-tree protected-main
reuse, independent Development eligibility, isolated signing, exact-byte Stable promotion,
Hold-plus-forward-fix recovery, Mosaic-only downstream authentication, and human authority over
upstream REVIEW/conflict Drafts.

Live read-only verification at closure found the protected repository settings, required
`Full validation`, Environments, configured Sync Bot credential names, and merge-commit-only model
intact. Recent PR/main CI and scheduled upstream operation were green. Existing upstream Draft PR
#58 is an authenticated human-review waiting state under the accepted model, not a baseline defect.
External settings remain manually administered; future UI/device validation, Wiki publication,
cross-repository standardization, and the feature backlog are non-blocking future responsibilities.

## Product direction

Expand Down
8 changes: 4 additions & 4 deletions docs/T0_3_DOCUMENTATION_CONSOLIDATION_PLAN.md
Original file line number Diff line number Diff line change
Expand Up @@ -4,8 +4,8 @@ Status: **T0-3 Documentation, Wiki & Roadmap consolidation — COMPLETE. D1-D7 c

This audit describes the documentation set at `main` commit
`44564901cbdb7ffce4b1c0704aa2d53f93c40fa9`. It does not move, delete, rename, or broadly rewrite
existing documents. T0-3 is now complete; Baseline T0 remains open and its final acceptance requires
separate review and authorization.
existing documents. T0-3 is complete. Baseline T0 was subsequently closed by its separate,
explicitly authorized final acceptance.

## Principles

Expand Down Expand Up @@ -410,5 +410,5 @@ tests, changed-scope pre-commit, whitespace validation, and Fast validation pass
Wiki, changes no operating contract, and performs no historical restructuring.

All T0-3 completion criteria below are satisfied. **T0-3 Documentation, Wiki & Roadmap
consolidation is COMPLETE.** Baseline T0 remains open; its independent final acceptance and closure
is the next checkpoint and is not authorized or performed by D7.
consolidation is COMPLETE.** At D7 closure, Baseline T0 remained open and its independent final
acceptance had not yet been performed; that separately authorized checkpoint subsequently closed it.
Loading