Skip to content

[MRG] reorganize tests per backends #3633

[MRG] reorganize tests per backends

[MRG] reorganize tests per backends #3633

Triggered via pull request June 25, 2026 14:14
@rflamaryrflamary
synchronize #828
release0.9.7
Status Failure
Total duration 4m 42s
Artifacts –

build_tests.yml

on: pull_request
Matrix: linux
Fit to window
Zoom out
Zoom in

Annotations

15 errors and 1 notice
linux (3.11)
Process completed with exit code 1.
build_from_source
Process completed with exit code 1.
linux (3.12)
The strategy configuration was canceled because "linux._3_11" failed
linux (3.12)
The operation was canceled.
linux (3.14)
The strategy configuration was canceled because "linux._3_11" failed
linux (3.14)
Process completed with exit code 1.
linux (3.13)
The strategy configuration was canceled because "linux._3_11" failed
linux (3.13)
The operation was canceled.
macos
Process completed with exit code 1.
linux-jax
Process completed with exit code 1.
linux-tf
Process completed with exit code 1.
windows
Process completed with exit code 1.
linux-torch
Process completed with exit code 1.
linux-minimal
Process completed with exit code 1.
doctests
Process completed with exit code 1.
macos
The macos-latest label will migrate to macOS 26 beginning June 15, 2026. For more information see https://github.com/actions/runner-images/issues/14167